Wikipedia

Search results

Thursday, 8 May 2014

QM: 6 Resource Management (6.1, 6.2, 6.3 & 6.4)


Introduction

As per Clause 6 the management shall ensure provision of resources for proper functioning of all the processes and sub processes defined within an organization. Proper planning shall ensure timely provision of resources, thus counter losses due to delay.

Cost benefit ratio shall be assessed for outsourced processes and sub process in comparison to in house competency and infrastructure.

The clause has four sub clauses which shall be justified in quality manual sequentially. Procedures/methods/processes adopted by organization for identification of resource need, provision of the identified resource and continuous evaluation of resource needs shall be defined.

Resources are required for implementation, maintenance, and continual improvement of QMS as well as enhancement of customer satisfaction by meeting customer requirements.

The resources are classified as:
          Human Resource
          Infrastructure
          Work environment.

For a pharma/biopharma segment the requirements of above resources are clearly defined in GMP/ Regulatory guidelines. The organization in its quality manual has to provide a map explaining how each requirement is addressed. References of procedures/ processes employed for resource management shall be given.


6 RESOURCE MANAGEMENT
6.1 PROVISION OF RESOURCES
6.2 HUMAN RESOURCES
6.2.1 General
6.2.2 Competence, Awareness & Training
6.3 INFRASTRUCTURE
6.4 WORK ENVIRONMENT

6. RESOURCE MANAGEMENT

6.1 Provision of Resources

Top management has the responsibility and authority for provision of resources.
Resources are provided by the organization to ensure
implementation, maintenance and continual improvement of the Quality Management System,
meeting customer and regulatory requirements,
meeting requirements of manpower/personnel, infrastructure, safety, security, working environment, process equipment, materials, information, finance etc.
Resource needs are determined during management review meetings, regular operations of individual department, contract reviews, production plan, change control, new specification requirements, corrective and preventive action, new product readiness reviews, and training evaluations etc. Determination of these requirements is also made through customer feedback, internal audits, and monitoring / measuring activities among others.
Once the requirement of resource is determined (it may be in the form of personnel assignments, allocation of space or equipment, training, procurement decisions, budgets, etc), a documented request is initiated through different resource provision channels such as warehouse, human resource, purchase, projects etc.

6.2 Human resources

6.2.1 General

Management ensures allocation of human resources among various functions, maximizing the utilization of available personnel resources to achieve business goals and performing the activities that are necessary in the maintenance of that workforce through identification of staffing requirements, planning and oversight of payroll and benefits, education and professional development, and administering their work-life needs.
The efficient and effective deployment of personnel resources where and when they are needed, and in possession of the tools, training and skills required by the work is the main goal/focus of the departmental managers and management (HR function).

6.2.2 Competence, Awareness and Training

Human resource requirement for each process/sub process is defined through functional organogram. Selection criteria for each position (including for personnel performing work affecting product quality) is based on their education, training, skill and experience in the relevant field. This requirement is captured in a Job Description for each position/function.
After screening the employees are hired.  All employees undergo Induction Training Program following which they report to their respective departments.
Departmental managers are responsible for identifying competency requirements, assigning Job Responsibility and for providing training within departments (departmental trainings). In-house training is provided to the members to enhance their competency & skills to perform the work more efficiently.
Departmental managers are also responsible for training and awareness programs for company-wide participation, such as: general orientation, rules and regulations, quality system, safety, and other company-wide systems and issues.
Quality Assurance and department managers ensure that employees understand the importance and relevance of their work and how it contributes to the achievement of Quality Objectives.
Appropriate qualifications, along with required training, provide the competence required for each position.
Based on this process, competency is not compromised and the employees become the most valuable resource for the organization.

Note: Training program shall be charted out for Temporary employee and contract employees. These trainings shall include fundamental cGMP trainings, specific trainings on duties assigned and safety training. Their training records shall be maintain and archived by Quality department.

6.2.2.1         Training Needs Determination/ Identification of training needs and awareness programs

The organization identifies personnel training needs, provides required training, and evaluates the effectiveness of the training provided.
Quality Assurance and Safety departments are responsible for identifying training needs and awareness programs for company-wide participation, such as: general orientation, rules and regulations, quality system, safety, and other company-wide systems and issues.
Departmental managers are responsible for identifying competency requirements and training needs in their districts, and for requesting departmental training sessions. Departmental training is primarily focused on increasing the level of skills in operating equipment and processes, skills meeting changed/ updated job responsibilities, update with current scientific knowledge, awareness of current regulatory and statutory requirements, and other specific requirements determined by departmental head. In addition, training needs or reviews are often identified in response to corrective or preventive action requests, as nonconformities may have been caused by inadequate training.
An annual review is conducted with each employee, at which time the employee’s training needs, as well as the effectiveness of the previous training are discussed (Personal Development Plan).
Depending on results of assessment of training needs, an Annual Training Calendar is drawn up in consultation with departmental manager. Training is provided based on training Calendar. Records of training are maintained as per Annual Training Calendar.

6.2.2.2 Training programs and training provisions:

The trainings provided in the organization are categorized as follows:
Induction training Program: Introduces employee to the organization and explains its structure, operational methodologies, processes unique to the organization, interaction of different processes to ensure quality product/services and general orientation of organizations QMS. Also gives introduction to requirements of product, customer and statutory & regulatory requirements applicable to product/service and processes.
On Job / skill specific/ departmental training: Training of standard operating procedure & specific skill, and personal qualification activities. The training includes formal documented trainings as well as informal on job trainings. It is primarily focused on increasing the level of skills in operating equipment and processes, conducting inspections and testing, using analytical and statistical techniques, and other such skills as appropriate for particular positions and jobs.
After the training period (limited in number of days such as 45 or 60) employees are evaluated against the position requirements and if performance is found to be satisfactory, qualification for the applicable position is awarded. Also when a procedure is created / updated and implemented, those employees responsible for that specific process are trained.
For personnel working under special environmental conditions or for certain critical tasks (such as intermediate and finished product testing, aseptic processing, work with hazardous and dangerous substances etc.) a rigorous training under proper supervision is provided and results evaluated. Only after satisfactory performance the personnel is qualified for conducting the task/activity. Quality Assurance shall ensure that all the training requirements are met and personnel are qualified before any critical work is assigned to him/her.
Refresher trainings: It is a sub category of on job training. It reinforces quality awareness and knowledge of quality policy, objectives and procedures, statutory and regulatory requirements and requirements of the product.

Remedial training/ Retraining: It is another sub category of on job training. These trainings are conducted as a result of nonconformance, corrective and preventive action, failure of Quality System etc.

Safety trainings: Instructs in safe working practices, use of personal protective equipment, first aid, site specific and regulatory requirements. The training is provided to all technical employees.
External training External seminars, conferences, and courses: Provided to individual employees on as-needed basis. This includes certification in specialized skills.
Self study: Reading training manuals, magazines, books, and reports. While all employees are encouraged to broaden their knowledge through reading, in some cases self-studying may be required as formal training. The company supports continuing education programs by reimbursing tuition for job related courses.
Trainings can be internal or external.  Training may be executed by an expert in the subject matter. The subject matter expert is obtained by: 1) hiring an external consultant; 2) an internal employee who comes with the background in education and experience applicable to the subject matter; or 3) an internal employee only after completing an external course in the subject matter.

6.2.2.3 Effectiveness

Effectiveness of training is evaluated using the following approaches:
immediate feedback
follow-up performance evaluation of trained employees
testing and Certification of technical personnel
review of the overall performance in areas relevant to particular training programs;
consideration of competency and training when investigating causes of quality system failures or process nonconformities;
through the performance (of process within QMS) review process.
Ultimately, comprehensive measures such as productivity, on-time delivery, and customer satisfaction are the most critical measures of training effectiveness.
Effective training will lead to the required competency level of employees. It ensures that employees are aware of the relevance and importance of their activities and how they contribute to the achievement of the quality objectives.

6.2.2.4 Training records

Training records are established for all technical and safety training. HR department maintains employee qualification and experience records. All the records of the training sessions, copies of district request, testing, and certification are maintained and archived by Quality Assurance department. However, employee training summary shall be available at the concerned department or the employee. 

6.3 Infrastructure

Suitable facilities (physical resources), work space, equipment, associated utilities, hardware, software’s,  supporting services (e.g, communication, transport,  logistics etc), and other necessary infrastructure are determined, provided and maintained, as required to achieve conformity to product requirements and meet latest scientific and regulatory & statutory standards.
As new infrastructure requirements arise, they will be documented in quality plans.

6.3.1 Buildings, workspace and associated utilities

a.       Infrastructure and facilities, such as buildings, workspaces and associated utilities, etc., are appropriate and are properly maintained to achieve conformity to product requirements and meet latest scientific and regulatory& statutory standards.
Where product supplied may contaminate other product/ personnel/environment, processes and / or procedures will be created to ensure containment is effective.
Planning of new, and/or modification of existing infrastructure and facilities is usually conducted in conjunction with product or process changes; capacity and/or work force expansions; and other such events. Facilities may also be expanded or modified to improve productivity and/or quality, or to improve the work environment. The entire process is performed within the framework of QMS and Regulatory requirements.
b.       Departmental managers are responsible for identifying the need and requirements for new, and/or modification or repair of existing infrastructure and facilities in their departments. Requests for changes and/or expansions of facilities are submitted to the top management for review and approval through change control procedure which is evaluated by regulatory department/expert before implementation.
c.       Maintenance of buildings and facilities is performed internally as well as through external contractors (incase in-house competency is not available). This includes regularly scheduled maintenance of lighting systems, air conditioning and heating systems, landscaping, and cleaning. Repairs of buildings and other such facilities are contracted as needed. Engineering and Maintenance department is responsible for coordinating and managing maintenance contracts.

6.3.2 Process equipment

Procurement of new, and/or modification of existing process equipment (including hardware and software) are planned in conjunction with development of manufacturing processes. The change is controlled through established change control procedure and reviewed by regulatory department/expert before implementation.

6.3.3 Supporting services

Supporting services required by organization include logistics, transportation, communication, pest control, solid waste disposal and information system (etc.).
Logistics and Transportation services are purchased from parcel delivery and courier services, and from trucking or other transportation companies or consolidators, as required. Transportation services are purchased. Logistics for the product and raw materials are coordinated by warehouse/dispatch and approved by quality assurance. Other transportation, shipping and parcel services are coordinated by administration department.
Communication services are provided by various telephone, wireless, and internet access companies. Purchase department (or administration) is responsible for administrating and coordinating these contracts.
IT systems are implemented and maintained by internal (or outsourced) department.
The IT Manager (or engineering) is responsible for selecting IT consultants and for administrating IT contracts.

6.3.4 Maintenance (Equipment and Facilities)

Maintenance of the buildings and facilities is performed as per plan.
Key process equipment, machines, hardware, and software are regularly maintained in accordance with maintenance plans specified by equipment manufacturers or departmental managers responsible for the equipment. Requirements for the maintenance of production equipment are specified.
Where process equipment/facility maintenance could affect product quality, the required maintenance activities have been documented including frequency of activity, or the lack of, and possible effects to product quality as required.
Equipment, machines, hardware and software are regularly maintained in accordance with maintenance plans specified by equipment manufacturer.

6.4 Work Environment

The organization provides for its employees suitable work environment needed to achieve conformity to product requirements meet and/or exceed customer expectations.
Note: Factors that may affect the conformity of the product include physical, environment and other factors such as noise, temperature, humidity, lighting, weather, cleanliness, protection from electrostatic discharge, etc.
Regarding physical factors, the company employs a wide range of activities to monitor and improve workplace safety, health, and ergonomics. These include adherence to good manufacturing practices, safety team meetings, and training.
The requirements of work environment (product related, human factor, health and safety) are determined during quality planning and documented in the quality plan. The work environment is managed for continuing suitability. Quality System review and its overall performance provide data which is evaluated to determine if the work environment is sufficient for achieving product conformance, or if preventive or corrective action related to the work environment is required.
Requirements for maintenance of the work environment are defined.

     A.   Product related requirements:

The company ensures environmental conditions and other factors that may negatively impact product quality are controlled and where appropriate monitored and measured. This may include basic housekeeping and control at production, testing storage and distribution stages.
Products are protected on site by controls (temperature, humidity, moisture etc) within the production and laboratories and by following environmental handling requirements in Production and Testing procedures.  Refrigerators and freezers are monitored manually and/or by min-max thermometers or online recorders with alarms in production.  In areas where final materials and finished products are stored (Finished Goods Manufacturing and Distribution in Building), freezers and refrigerators are monitored by digital display, chart recorders or online recorders with audio visual alarms. Retained samples stored by Quality control are also monitored by digital display, chart recorders or online recorders with audio visual alarms.  Documented procedures are in place to define these processes.
Storage conditions for materials and products are mentioned in their documented specifications, procedures and batch manufacturing records. Controls are in place to ensure that materials and products are stored and shipped at the correct temperatures and under the correct conditions, e.g. protected from light, moisture, shock, vibration etc (as applicable).

     B.    Human factors

Top Management and departmental Representatives are responsible for ensuring suitable social and psychological conditions in the workplace. This is to include such aspects as interaction and communication between employees, employee harassment, conflict resolution and so forth. Relevant workplace policies are implemented mainly through training and awareness programs.
Where work environment is required to be monitored and controlled, as to avoid having an adverse affect on product quality, the requirement(s) will be included in the procedure for product manufacturing and control.
The work environment is air-conditioned and each person is provided with a workspace and associated equipment/furniture to be able to perform their tasks. The work environment is controlled for temperature, lighting, cleanliness, and noise conditions. The company has documented procedures for health, cleanliness and clothing of personnel, to prevent adverse affect to the quality of the product. Additional requirements are specified in production, testing, and cleaning & maintenance procedures. Where applicable (e.g during production and testing) work environment controls required in terms of health, cleanliness and sterilization are maintained. This includes training and monitoring of these requirements.
Personnel whom may be required to temporally work in special environmental conditions are properly trained or supervised by trained personnel.

     C.    Health and safety

Health and safety management system is independent from the quality management system. It is administrated by the Safety Officer and is documented in the Health and Safety (H&S) manual.
Procedures for production, testing, cleaning, maintenance, assembly (etc.) defines the requirements for personal protective equipment throughout the site.  This policy is enforced by the Environmental Health and Safety (EHS) Department and managed by the site departments.

EHS Management system monitors and controls specific health and safety issues, provide instructions for performing work in a safe and healthy manner. This includes trainings and mock drills in different safety and health aspects.

No comments:

Post a Comment